WHERE MARGIN LEAKS

04 places to look
01Yield varianceTwo shifts running the same asset to different results, with the difference living in operator judgement nobody has written down.
02Unplanned downtimeFailures that were visible in the signals hours earlier, to nobody who was looking at them.
03Energy and utilitiesConsumption optimised at the site level and given back at the setpoint level.
04Shift handoverThe most important information in the plant, moved by conversation and a notebook.

WHAT WE DEPLOY

AI ENGINEERING

Operating advisers on the line

Setpoint and sequencing recommendations that explain themselves, so an operator can accept or override with the reason recorded.

DATA & DIGITAL

Historian data made usable

Time-series, batch records and lab results aligned to one timeline you can actually model against.

PROCESS TRANSFORMATION

Handover rebuilt

The knowledge that moves between shifts captured where the work happens rather than in a meeting after it.

A TYPICAL 14 WEEKS HERE

Across shifts and across a changeover — the variance you care about only shows up in the differences.

WEEK 01–02

With the crews

Sessions with operators on more than one crew, and around at least one changeover.

WEEK 03–06

One asset, one baseline

A single line or unit, measured against its own recent history rather than a vendor benchmark.

WEEK 07–14

Into the control loop

Historian and control-layer integration, safety review, and advisory-mode rollout before anything closes a loop.

ONGOING

Operations owns it

Runbooks written for shift teams, with the engineering group holding the model.

IN PRODUCTION

PLACEHOLDER — SWAP IN REAL ENGAGEMENTS
INDUSTRIAL PRODUCTION
[00]

[HEADLINE — WHAT CHANGED]

[PLACEHOLDER — ADD A REAL ENGAGEMENT FOR THIS SECTOR, OR REMOVE THIS SECTION UNTIL ONE CLEARS]

WHAT IT TOOK

[DURATION AND TEAM]

[PLACEHOLDER — CONFIRM ENGAGEMENT LENGTH, TEAM SHAPE AND CAPABILITIES INVOLVED]

WHO RUNS IT

[THE CLIENT'S TEAM]

[PLACEHOLDER — CONFIRM WHO OPERATES IT TODAY AND WHAT THE HANDOVER INCLUDED]

START WITH ONE UNIT.

One asset, its own history as the baseline, and an honest read on whether the signal is there.