WHERE MARGIN LEAKS

04 places to look
01QuotingDrawings, RFQs and historicals reconciled by hand, with your best estimator as the bottleneck and the slowest quote losing the job.
02Changeover and schedulingPlans built on the last shift's assumptions, then rebuilt by whoever is on the floor when reality disagrees.
03Quality and reworkDefect causes known informally and rediscovered every time the line runs a variant it has not seen for months.
04MaintenanceFixed intervals on some assets, run-to-failure on the rest, and no way to say which is costing more.

WHAT WE DEPLOY

AI ENGINEERING

Intake and estimating agents

Reading drawings and RFQs, pricing against historicals, and escalating only the edge cases to the estimator who used to price everything.

DATA & DIGITAL

One version of production data

MES, ERP and quality systems reconciled into figures the plant and the finance function both accept.

PROCESS TRANSFORMATION

Exceptions that route themselves

The paperwork path rebuilt so automation is the default and the human step is reserved for judgement.

A TYPICAL 14 WEEKS HERE

Including the crews on other shifts, because that is usually where the workarounds live.

WEEK 01–02

With the estimators

Two weeks of sessions with estimators, planners and supervisors across shifts — watching the process run rather than reading a document.

WEEK 03–06

Prove on real jobs

One product family, historical quotes as the baseline, measured against what the estimating team actually achieved.

WEEK 07–14

Into the plant

Integration with MES and ERP, security review, and a staged rollout by product family.

ONGOING

Their engineers

Runbook, training and an on-call window while the plant's own team takes it over.

IN PRODUCTION

PLACEHOLDER — SWAP IN REAL ENGAGEMENTS
MANUFACTURING
6h

Quote turnaround, down from five days

An intake agent reads drawings and RFQs, prices against historicals, escalates only edge cases.

WHAT IT TOOK

[DURATION AND TEAM]

[PLACEHOLDER — CONFIRM ENGAGEMENT LENGTH, TEAM SHAPE AND CAPABILITIES INVOLVED]

WHO RUNS IT

[THE CLIENT'S TEAM]

[PLACEHOLDER — CONFIRM WHO OPERATES IT TODAY AND WHAT THE HANDOVER INCLUDED]

TWO HOURS WITH YOUR ESTIMATORS.

Bring us the process your best estimator is the bottleneck for.